The first step in activity-based costing is to
A. assign manufacturing overhead costs for each activity cost pool to products.B. compute the activity-based overhead rate per cost driver.
C. identify and classify the major activities involved in the manufacture of specific products.
D. identify the cost driver that has a strong correlation to the activity cost pool.