Nagpur road plan formula were prepared by assuming
a) rectangular or block road pattern
b) radial or star and block road pattern
c) radial or star and circular road pattern
d) radial or star and grid road pattern
Answer: D
Highway Engineering
- The desirable length of overtaking zone as per IRC recommendation is equal to
- On a single lane road with two way traffic, the minimum stopping sight distance is equal to
- Compared to a level surface, on a descending gradient the stopping sight distance is
- Camber in the road is provided for
- The shoulder provided along the road edge should be
- Coefficient of friction is less when the pavement surface is
- When the path travelled along the road surface is more than the circumferential movement of the wheels due to rotation, then it results in
- The stopping sight distance depends upon
- For water bound macadam roads in localities of heavy rainfall, the recommended value of camber is
- The shape of the camber, best suited for cement concrete pavements, is
- The sequence of four stages of survey in a highway alignment is