During construction, the CM-at-Risk project delivery method has the CM in a position equivalent to:

During construction, the CM-at-Risk project delivery method has the CM in a position equivalent to: 




A) An owner
B) A designer
C) A subcontractor
D) A general contractor





Answer: D